I'm Wan Azri — a project controls consultant and forensic delay analyst with over a decade of experience across the full project lifecycle. From baseline scheduling on day one to forensic analysis in arbitration, I work at the intersection where construction, contracts, and data meet.
Project controls consultant · Forensic delay analyst · HRDCorp training provider · Malaysia & Australia
What I do
Construction projects live and die by their controls. A well-built schedule, maintained rigorously, protects your programme. A well-documented project, run with discipline, protects your claim. And when things go wrong — as they inevitably do — the quality of your forensic analysis determines how much of your entitlement you recover.
I provide both sides of that equation: project controls consultancy across the full project lifecycle, and specialist forensic delay analysis when disputes arise. The two are not separate disciplines — one builds the record, the other reads it.
When a construction project ends in dispute, the analysis needs to withstand cross-examination by opposing experts and scrutiny from an arbitration tribunal. I conduct forensic delay analysis using Window Analysis methodology — constructing the as-built record, identifying delay events within discrete time windows, attributing responsibility, and quantifying time entitlement with the precision that legal proceedings demand.
I have served as supporting forensic delay analyst and expert witness support across 16 arbitration cases and EOT matters — including the Blackwater Gold Mine (British Columbia, Canada), Sarawak Coastal Road Package 4, Atria Damansara, City of Dreams Penang, and the KTM Double Track Seremban–Gemas railway.
For: Contractors, legal counsel, and project owners in active arbitration, adjudication, or EOT proceedings
A well-prepared Extension of Time claim is structured, substantiated, and built to survive scrutiny. I prepare EOT submissions that connect delay events to critical path impact and quantify entitlement with a defensible evidence chain.
Past EOT work: Damansara City Hotel (Daewoo E&C), KL Eco City (Ireka Engineering), Public Bank Tower KL (Daewoo E&C), KLCC District Cooling Centre Phase 2, I-City Central Plaza, ICON City Package 3, and others.
For: Main contractors and subcontractors preparing or defending time claims
Project controls done properly — from tender programme through baseline, progress monitoring, recovery scheduling, and final as-built — gives you both a managed project and a protected claim position. I deliver scheduling across all project phases using Primavera P6, Microsoft Project, and Synchro 4D, across sectors including infrastructure, high-rise, energy, and civil works.
Portfolio includes: DASH Expressway CA4, Fortescue Decarbonisation Substations (Eliwana, Perth), MRT Multi-Storey Car Parks (Kepong & Cheras), Oxley Tower KL, Sungai Jernih Embankment Dam (RM130M), and Petronas Chemical MTBE Kuantan (4D BIM).
For: Project directors, contractors, and developers requiring structured planning support across any project phase
Beyond scheduling, sound project controls means having systems — reporting frameworks, document control discipline, progress measurement, and the earned value visibility that allows project directors to act before problems become disputes. I advise on project controls setup for organisations building this capability, and provide embedded advisory for live projects.
For: Developers and project owners establishing project controls infrastructure from the ground up
Construction simulation using Synchro 4D for programme visualisation, logistics planning, and stakeholder communication. Bridges the gap between the schedule and the physical construction sequence.
For: Contractors and developers requiring 4D programme integration on complex builds
I'm a developer as well as a consultant. The products I'm building come directly from gaps I encounter in project controls practice.
A construction site diary app designed around the document trail that delay claims depend on. Daily progress records, weather logs, labour and plant tracking, and instructions received — structured for evidentiary value, not just reporting.
constructionsitediary.com →A web tool for reading, comparing, and analysing Primavera P6 XER files without a P6 installation. Built for planners, project controls engineers, and legal teams who need schedule data portable and accessible.
Coming soonNexus Project Controls is a registered HRDCorp training provider (Serial No. 1523595T) with 36 programmes for construction and project management professionals. Core programmes: Primavera P6 (Basic to Advanced), Microsoft Project (Basic to Advanced), Extension of Time Claim Analysis, CPM Using Microsoft Project, BIM & OSH, Building Inspection & Forensic Training.
Available in-house (tailored) and open enrolment · Bahasa Malaysia & English
Project controls, construction tech, and building a specialist practice.




Whether you need forensic analysis for an active dispute or project controls advisory on a live build — let's talk about what your project needs.
Get in Touchwan.azri@nexusprojectcontrols.com · +6011 2188 8560
Lot 9139-B (2nd Floor), Lorong Pulau Pinang, Off Jalan Bandar 4, Taman Melawati, 53100 Kuala Lumpur
www.nexusprojectcontrols.com